In-Ground Pool Installation: Step-by-Step Process and Timeline Guide

Affording a Pool is Easier Than You Think!

Introduction

Installing an in-ground pool involves several steps that vary depending on the type of pool you choose: vinyl liner, fiberglass, or gunite (concrete). Understanding the installation process and timeline can help you plan for the project, manage expectations, and ensure a smooth experience. Here, we’ll explore each stage of the installation process and provide a breakdown of timelines for each type of in-ground pool.

Overview of In-Ground Pool Installation

Each type of in-ground pool has a unique installation process. Here is a brief overview of the steps involved in each:

 

  • Vinyl Liner Pools: Vinyl liner pools require the construction of a frame, usually made of steel or polymer, to support the vinyl liner. This pool type is popular for its affordability and customizability, and it typically has a shorter installation time.

 

  • Fiberglass Pools: Fiberglass pools are pre-manufactured shells that are transported to your home and installed in an excavated hole. This type is known for quick installation, durability, and low maintenance.

 

  • Gunite (Concrete) Pools: Gunite pools are custom-built on-site using a mixture of concrete and sand sprayed onto a steel rebar frame. This type takes the longest to install but offers maximum customization and durability.

 

Site Preparation and Permitting

The first stage in installing any in-ground pool is preparing the site and securing permits.

 

  • Site Assessment: A site assessment is conducted to evaluate the terrain, soil conditions, and water table. A qualified pool contractor will inspect the area to determine the best location for the pool, as well as any adjustments needed to address sloped or uneven ground.

 

  • Permits: Most local governments require permits for in-ground pool construction. This process can take anywhere from a few days to several weeks, depending on local regulations. Fees for permits can vary widely, so it’s essential to research and budget accordingly.

 

  • Clearing and Marking the Site: The installation area must be cleared of vegetation, debris, and any structures in the way. The pool outline is marked, and the location of plumbing, electrical lines, and other components is planned.

 

  • Timeline: Site preparation and permitting typically take 1-2 weeks, although it can be longer if there are delays with permits or inspections.

Excavation

Excavation is the first major step of the physical installation process. In this stage, the pool’s shape is dug out of the ground.

 

  • Process: Excavation machinery digs the hole according to the dimensions and depth of the pool design. The contractor will also ensure the area around the pool has enough room for decking and other features planned for the project.

 

  • Soil Disposal: The excess soil from the dig may need to be transported off-site, adding to both time and cost. Some contractors include soil removal in their services, while others may charge an additional fee.

 

  • Timeline: Excavation generally takes 1-3 days for most pool types, though more complex designs or challenging soil conditions can add time.
Custom Pool Construction

Installation Process by Pool Type

Each type of in-ground pool has a distinct installation process. Here’s a detailed look at each:

Vinyl Liner Pool Installation

  • Framing and Wall Installation: Once excavation is complete, walls made of steel, polymer, or aluminum are assembled to create the frame. These walls are bolted together and anchored in place.

 

  • Plumbing and Electrical: Plumbing lines for water circulation, filtration, and any additional features (like fountains or spas) are installed. Electrical connections for pool lighting and other accessories are also set up.

 

  • Backfilling and Floor Preparation: The bottom of the pool is prepared using a mixture of sand or grout to create a smooth surface for the vinyl liner. This floor base is compacted and leveled to prevent shifting.

 

  • Liner Installation: The vinyl liner is carefully spread across the pool frame and vacuumed to remove air pockets. It’s then secured to the frame, creating a watertight seal.

 

  • Filling and Final Touches: The pool is partially filled with water to settle the liner in place. Any necessary adjustments are made, and the remaining backfill is completed around the pool walls.

 

Timeline for Vinyl Pools: The entire process typically takes 4-8 weeks depending on weather conditions and any customizations.

Fiberglass Pool Installation

  • Shell Delivery and Placement: Fiberglass pools come pre-made, so the shell is transported to the site. Using a crane, the shell is lowered into the excavated area and leveled. This precise placement is crucial for the shell to sit correctly.

 

  • Plumbing and Electrical Connections: The plumbing system, including the filtration and circulation lines, is connected to the pool. Electrical connections for lighting and heating systems are also set up at this stage.

 

  • Backfilling: Backfill material, usually gravel or sand, is added around the shell to secure it in place. The pool is filled with water in stages to help balance the pressure between the inside and outside of the shell as the backfill is added.

 

  • Decking and Surroundings: Concrete or other decking material is poured around the pool’s perimeter to create a stable surface. Any additional landscaping or custom features can be installed as well.

 

Timeline for Fiberglass Pools: Fiberglass pool installation is one of the fastest, typically taking 2-3 weeks once the shell is delivered.

Gunite (Concrete) Pool Installation

  • Steel Reinforcement (Rebar) Framework: A rebar frame is installed in the excavated hole to create the structure of the pool. This framework will support the concrete and reinforce the pool’s shape and depth.

 

  • Plumbing and Electrical Setup: Plumbing and electrical lines are positioned within the rebar framework. The plumbing must be set up before the gunite is applied to ensure proper placement.

 

  • Gunite Application: Gunite, a mixture of concrete and sand, is sprayed onto the rebar framework using high-pressure equipment. Contractors shape and smooth the gunite to form the pool’s floor, walls, and any custom features like steps, benches, or ledges.

 

  • Curing Process: The gunite requires several weeks to cure (usually 2-4 weeks). During this time, it’s regularly sprayed with water to prevent cracks and ensure even curing.

 

  • Surface Finish and Tiling: After curing, a plaster, pebble, or tile finish is applied to the gunite shell. This provides a smooth, water-resistant surface and adds to the pool’s aesthetic appeal.

 

  • Decking and Landscaping: Once the interior is finished, the decking and any landscaping features are installed around the pool.

 

  • Timeline for Gunite Pools: Gunite pools have the longest installation timeline, typically taking 8-12 weeks due to the curing process and custom design elements.

Adding Pool Features and Final Touches

After the basic structure is installed, additional features can be added to customize the pool. These may include:

 

  • Water Features: Waterfalls, fountains, jets, and bubblers can enhance the pool experience.

 

  • Lighting: LED and color-changing lights can be added to create ambiance and extend pool usability into the evening.

 

  • Heating Systems: Pool heaters, such as gas, electric, or solar heaters, are installed to allow for year-round swimming.

 

  • Safety Covers and Fencing: Safety covers, fencing, and other barriers are installed to meet local safety regulations.

 

  • Timeline for Custom Features: Adding these features generally takes 1-2 weeks, depending on the complexity of the setup.

Final Inspection and Testing

Before your pool is ready for use, a final inspection and testing are conducted to ensure everything is functioning correctly.

 

  • Water Testing: Pool water is tested to confirm that chemical levels (pH, alkalinity, and chlorine) are balanced for safe swimming.

 

  • Equipment Testing: Filtration, circulation, heating, and lighting systems are tested to confirm they are operational.

 

  • Local Inspection: In most areas, a final inspection by a city or county official is required to ensure the pool complies with building codes and safety regulations.

 

Timeline for Final Inspection: Final inspections and testing usually take a few hours to a day but may vary based on local requirements.

Total Timeline for Each Pool Type

Here’s a summary of the expected timeline for each type of in-ground pool:

 

  • Vinyl Liner Pools: 4-8 weeks (depending on site preparation, customization, and weather)

 

  • Fiberglass Pools: 2-3 weeks (after the shell is delivered)

 

  • Gunite Pools: 8-12 weeks (due to the gunite curing time and custom features)

Factors that Can Affect the Installation Timeline

Several factors can influence how long it takes to complete an in-ground pool installation:

 

  • Weather: Rain, snow, and extreme heat can delay excavation, concrete application, and curing.

 

  • Permits and Inspections: Waiting for permits and passing inspections can cause delays, particularly in regions with stricter regulations.

 

  • Site Conditions: Poor soil conditions, high water tables, and uneven terrain can complicate excavation and extend the timeline.

 

Customization Level: Custom features and complex designs add time to installation, especially with gunite pools.

Conclusion

Installing an in-ground pool involves careful planning, multiple stages, and coordination with contractors and local authorities. Each pool type—vinyl, fiberglass, and gunite—has a unique installation process and timeline, with fiberglass pools offering the quickest installation and gunite pools taking the longest due to customization options. By understanding these steps and timelines, you can set realistic expectations for your project and enjoy a smooth path to your new backyard oasis.

Ready to Build Your Dream Pool?

Working Hours

Mon - Sat : 9.00 - 5.00
Sun : 10.00 - 4.00

Phone Number

PA 215-491-1116

Best Swimming Pool & Outdoor Living Design-Build Company in Bucks County, PA

CONTACT FS LANDSCAPING CONTRACTORS TODAY!​

For over 25 years, FS Landscaping Contractors, Inc. has specialized in designing and building custom swimming pools and outdoor living spaces.  We are considered to be one of the top swimming pool & landscape designers in the Southeast Pennsylvania region. Schedule your appointment with one of our designers today! We look forward to meeting you!

Schedule an appointment with our award winning design team today!

Contact FS Today!

For over 25 years, we have designed and built some of the most envied backyards in our region. Fill out the form below to schedule your appointment with our design team today. We look forward to working with you!

How can we help you?